The erection process of pre-engineered metal buildings involves a systematic and efficient assembly of the pre-designed components. Typically, it starts with the foundation preparation and anchor bolt installation. The steel framework, consisting of columns, rafters, and beams, is then carefully assembled and connected according to the engineered specifications. Once the primary structure is in place, secondary components such as wall and roof panels, along with doors and windows, are installed. Read more from the blog: https://www.bloglabcity.com/de....scribing-the-process